|
|
|
Project
Experience
For
years, PT. Dwirajaya Satya has been involved by some major contractor to
supply for Oil and Gas projects, this proven our capability to works and
supply for specific requirement materials and equipments. Moreover, we
also involve in Petrochemical, Sugar and lot of general industries
projects.
Oil
& Gas Project Experience List
|
CALTEX,
CGS-10 Project
Year
: 2000
Contractor
: PT. Envitech Perkasa
Supply
:
 |
Two
(2) units of submersible pump for "Clarified Slop Oil
Pump" |
 |
One
(1) unit of submersible pump for "Sludge Pump" |
 |
One
(1) unit of ANSI horizontal centrifugal pump for "Potable
Slop Oil Pump" |
|
|
CALTEX,
Duri Steamflood Area 11 Project
Year
: 2001
Contractor
: PT. Tripatra Engineering and Constructor
Supply
:
 |
Three
(3) units of submersible pump for "Storm Water Pump" |
 |
Six
(6) unit of Selfpriming pump for "Overflow Pump" |
|
|
CONOCO,
Hang Tuah Modification Project
Year
: 2002
Contractor
: PT. Istana Karang Laut
Supply
:
 |
One
(1) units of vertical sump pump for "Condensate Pump" |
|
|
Gulf
Indonesia (Grissik) Resources, South Jambi "B" Shallow Gas
Project
Year
: 2003
Contractor
: PT. Tripatra Engineering and Constructor
Supply
:
 |
One
(1) unit of ANSI low-flow horizontal centrifugal pump for
"Ethylene Glycol Transfer Pump" |
 |
Two
(2) units of ANSI low-flow horizontal centrifugal pump for
"Produce Water Charge" |
 |
Two
(2) units of ANSI low-flow horizontal centrifugal pump for
"LP Vent Scrubber Pump" |
 |
Two
(2) units of ANSI low-flow horizontal centrifugal pump for
"Diesel Fuel Transfer Pump" |
 |
Two
(2) units of ANSI low-flow horizontal centrifugal pump for
"Potable Water Pump" |
 |
Two
(2) units of low-flow horizontal multistage pump for "Flare
KO Drum Pump" |
 |
Two
(2) units of low-flow horizontal multistage pump for
"Condensate Shipping Pump" |
 |
Two
(2) units of API 610 8th Edition Vertical In-line centrifugal
pump for "Heat Medium Circulating Pump" |
|
|
KUFPEC
(Indonesia) Ltd, Phase II, Oseil 4 Expansion, First Five Well
Project
Year
: 2004
User
: PT. KUFPEC (Indonesia) Ltd.
Supply
:
 |
One
(1) unit of positive displacement gear pump for "Asphaltene
Dispersant Transfer Pump" |
|
|
REKAYASA
INDUSTRI (Indonesia), EPC Total Kamojang 1 x 60 MW Project
Year
: 2006
User
: PT. Pertamina Indonesia (Persero)
Supply
:
 |
Two
(2) units of Self Priming Pump with Electric Motor & Diesel
Engine Driver |
|
|
REKAYASA
INDUSTRI (Indonesia), South Sumatera West Java Gas Pipeline Project
Phase I - CP5
Year
: 2006
User
: Perusahaan Gas Negara (Persero) Tbk
Supply
:
 |
Three
(3) Units of API 610 Centrifugal Pumps |
|
|